COMPLETED PROJECT
NORTHERN WESTCHESTER HOSPITAL
Darlind was selected as the General Contractor for the construction of the Hospital’s new Oxygen Storage Project.
The project consisted of a 14 foot high retaining wall and pad constructed into the side of a hill which serves to create a space on the tight site for the Hospital’s oxygen tanks and equipment. The area, approximately 140x30 houses the medical use oxygen for the facility.
It was necessary that the existing oxygen equipment remain in place and functional while the new supply lines, manifold, control panels, electric and controls were installed. A temporary oxygen supply was brought in for the Hospital’s use while the switch over took place.